Challenge

To meet code, 36" of space is needed from the face of stair tread to the face of wall.  Also, the floors in this basement were concrete making the space cold and quite dark. The family's wish list included a home gym on one side, a rec room on the other and also a storage area for the wine.

Solution

Tri State was able to help them make their wishes become a reality! To conform with this this code requirement, Tri-State built a stair landing the height of the bottom stair and had a step to the right and left for passage. No obstacles will keep our crew from completing a project!